Skip to main content
915 TLDR
Politics
1 read

USS Cleveland Marks End of Controversial Littoral Combat Ship Program

KVIACNN Newsource
Government building representing politics and policy news

Want the full story?

Read the complete article at KVIA

Read Original

AI Summary

The U.S. Navy recently commissioned its final littoral combat ship (LCS), the USS Cleveland, amidst ongoing criticism of the program's effectiveness and cost. Initially designed to enhance naval operations in coastal waters, the LCS program has faced significant mechanical issues since its inception in 2008, leading to its nickname, 'little crappy ships.' With a projected cost of over $100 billion, the LCS has been labeled one of the military's most expensive failures. Despite these challenges, the Navy plans to continue utilizing the LCS as part of its fleet strategy, emphasizing its role in mine countermeasures and other low-end capabilities. The future of the LCS remains uncertain, as the Navy attempts to salvage its investment while addressing operational shortcomings.

Key Details: • USS Cleveland is the last of 35 LCS commissioned. • Total cost of the LCS program may exceed $100 billion. • Seven LCS have already been decommissioned, with more retirement plans blocked by Congress. • The Navy's 2026 shipbuilding plan still includes the LCS as a low-end fleet capability.

military defense navy shipbuilding littoral-combat-ship

People & Organizations

U.S. NavyPersian GulfSouth China SeaHung CaoProPublicaVern ClarkRobert WorkLake Erie

Related Articles